Case Studies.

Commercial Fit-out

Industry: Commercial
Location: Bibra Lake
Square Metres: 968m2
Project Length: 5 months

  Buildcom was contracted to construct a two story office warehouse training facility in Bibra Lake. Fit-out was required to all rooms of the building to accommodate their clientele.  

Read more...

Distribution Centre

Industry: Commercial
Location: Bassendean
Square Metres: 10,000m2
Project Length: 10 Months

WA Based company Veale Auto Parts engaged Buildcom Construction to complete a Design and Construct for their first Distribution Centre. The Client requested design input and expressed their vision which…

Read more...

Fire Suppression System

Industry: Commercial
Location: Wangara Perth WA
Square Metres: 12,000m2
Project Length: 11 Months

Complete Office Supplies contracted Buildcom Construction to complete a Design and Construct for their distribution Centre expansion in WA. We designed the building specific to the clients needs. Due to…

Read more...

Overhead Gantry Crane

Industry: Industrial Commmercial
Location: Wangara
Square Metres: 4,500m2
Project Length: 10 months

Buildcom Construction had been contracted by a repeat Client, Gear Drives, to deliver a purpose built project for their expansion in WA. Our client required a Commercial Builder with the…

Read more...

Concrete Floor Finishes

Industry: Commercial
Location: Wangara
Square Metres: 12,000m2
Project Length: 11 months

Slab on ground is the most common type of floor base in commercial construction with possibility of unlimited life span if designed and constructed correctly. The longevity of the concrete…

Read more...

Medical Fit-Out

Industry: Medical
Location: Piara Waters
Square Metres: 1145m2
Project Length:

Buildcom Construction was contracted by a private client to construct a medical facility in a new, bustling residential estate, located in Piara Waters, Western Australia. The medical centre comprises of…

Read more...

Commercial Passenger Lift

Industry: Commercial
Location: Bibra Lake
Square Metres: 968m2
Project Length: Installed in 1 day

  Our client required a passenger lift to be installed within their training facility to gain access to the first floor training rooms.  

Read more...

Demolition

Industry: Commercial
Location: Bunbury
Square Metres: 2844m2
Project Length: Demolition complete in two weeks

Buildcom was contracted by a private client for this Design and Construct project located in Bunbury, WA. The site had an existing office/ warehouse which was aging and was beyond…

Read more...

Commercial Building Extensions

Industry: Commercial
Location: Bibra Lake
Square Metres: 3,892 m2
Project Length: 6 months

Suez Recycling & Recovery Facility, located in Bibra Lake, required building extensions to their existing facility. Buildcom Construction was contracted to extend three areas, the workshop, east shed and a…

Read more...

Insulated Wall Panels

Industry: Commercial
Location: Canning Vale
Square Metres: 11600w x 6700H per wall (2 Walls)
Project Length: 1 day for installation

Buildcom was contracted by the client to install insulated wall panels to the interior of the building. The client required another room to be created, bounded by the insulated panelling.…

Read more...

Cool Rooms & Loading Dock

Industry: Commercial
Location: Wangara, WA
Square Metres: 2282m2
Project Length: 6 months

Buildcom Construction had been contracted to complete a Design and Construct. Our client’s tenant requested to be involved with the overall design process to ensure their needs were being met.…

Read more...