Cool Rooms & Loading Dock

Office Warehouse with Cool Room & Loading Dock

Industry: Commercial
Location: Wangara, WA
Square Metres: 2282m2
Project Length: 6 months
Value of Construction: $1.3m
Project Description:

Buildcom Construction had been contracted to complete a Design and Construct. Our client’s tenant requested to be involved with the overall design process to ensure their needs were being met. Specific requirements for the new purpose built facility included; dry store, freezer room, cool room, anti-room and load dock with leveler. The load dock design must take into consideration the very strict local council car bay requirements as they provided no leniency at time of design.

Customised Solution:

The facility would receive and dispatch dry and frozen goods on a daily basis. The load dock with dock leveler had been designed and constructed to suit standard delivery trucks to semi-trailers whilst still complying with local council’s strict requirements for car bays and delivery bays.

The warehouse fitout required specialised areas to store goods received prior to being dispatched to their customers. We list these features below.

Specialised features:

  • Dry Store Area
  • Cool Room Area
  • Freezer Room
  • Anti Room
  • Ceiling mounted forced coolers
  • Temperature alarm sensors
  • Bitzer condenser units
  • Bitzer compressor units
  • Blue Giant Dock Leveler w/ hydraulic velocity fuse fall safe system
  • Steel Fire Shutter with 4 hr burn time
  • Insulated pipework
  • Actron air conditioning units throughout office areas

 

Results:

Our Client was satisfied the completed project provided the specific needs as requested by the tenant.